Aberdeencityandshire-sdpa.gov.uk / Planning inquiries



Domain overview in Planning Inquiries niche. Based on relevant links and pages only.
aberdeencityandshire-sdpa.gov.uk rank
120
Number of domains linking to aberdeencityandshire-sdpa.gov.uk
1
semantic flow
0.13
Number of links to aberdeencityandshire-sdpa.gov.uk
2
semantic flow
0.13
Number of domains linked from aberdeencityandshire-sdpa.gov.uk
8
semantic flow
1.93
Number of links from aberdeencityandshire-sdpa.gov.uk
29
semantic flow
1.93

Popular pages pointing to aberdeencityandshire-sdpa.gov.uk

Pages with highest topical PageRank pointing to domain.

url / atext / target url
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
habitats regulations assessment
http://www.aberdeencityandshire-sdpa.gov.uk/nmsruntime/saveasdialog.aspx?lID=897&sID=38
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
strategic development plan main issues report 2011
http://www.aberdeencityandshire-sdpa.gov.uk/nmsruntime/saveasdialog.aspx?lID=899&sID=38
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
main issues report
http://www.aberdeencityandshire-sdpa.gov.uk/nmsruntime/saveasdialog.aspx?lID=958&sID=38
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
development plan scheme 2013 2014
http://www.aberdeencityandshire-sdpa.gov.uk/nmsruntime/saveasdialog.aspx?lID=1033&sID=38
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
strategic development plans in scotland the way forward
http://www.aberdeencityandshire-sdpa.gov.uk/nmsruntime/saveasdialog.aspx?lID=414&sID=38
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
aberdeen city and shire strategic development plan 2014
http://www.aberdeencityandshire-sdpa.gov.uk/nmsruntime/saveasdialog.aspx?lID=1111&sID=38
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
aberdeen city and shire structure plan 2009
http://www.aberdeencityandshire-sdpa.gov.uk/nmsruntime/saveasdialog.aspx?lID=423&sID=38
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
strategic development plan sea scoping report
http://www.aberdeencityandshire-sdpa.gov.uk/nmsruntime/saveasdialog.aspx?lID=578&sID=38
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
archived publications
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/ArchivedPublications.aspx
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
housing need and demand assessment 2010
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/HNDA.aspx

Popular pages from aberdeencityandshire-sdpa.gov.uk

On-topic pages from domain with highest topical PageRank.

title / url
PR


info
relevance


info
links


info
rel links


info
external links


info
external domains


info
referring domains


info
external backlinks


info
Aberdeen City and Shire | Strategic Development Planning Authority - Publications
http://www.aberdeencityandshire-sdpa.gov.uk/AboutUs/Publications.aspx
0.280.751173300
Aberdeen City and Shire | Strategic Development Planning Authority - Home
http://www.aberdeencityandshire-sdpa.gov.uk/
0.211112522211

Domains with most semantic flow to aberdeencityandshire-sdpa.gov.uk

Relevant domains with most links to selected domain.

domain info
count


info
semantic flow


info
http://gov.scot/ 20.13gov.scot

Domains with most semantic flow from aberdeencityandshire-sdpa.gov.uk

Relevant domains with most links from selected domain.

domain info
count


info
semantic flow


info
http://scotland.gov.uk/ 100.72scotland.gov.uk
http://aberdeencity.gov.uk/ 70.44aberdeencity.gov.uk
http://aberdeenshire.gov.uk/ 60.42aberdeenshire.gov.uk
http://gov.scot/ 20.14gov.scot
http://green-alliance.org.uk/ 10.07green-alliance.org.uk
http://parliament.uk/ 10.07parliament.uk
http://legislation.gov.uk/ 10.04legislation.gov.uk
http://vimeo.com/ 10.03vimeo.com

Random 'planning inquiries FAQs', may be related to more specific topics, not general planning inquiries topic.

PLANNING INQUIRIES FAQs

NAVIGATE CITY SERVICES AND LEGAL PROCESSES?.

Q: How can I apply for a new address assignment?
A: You will need to submit an application form, fees, and a site plan to planning@cityofepa.org for review in order to be assigned a new address.
Q: How do I pay fees for a planning permit?
A: Community and Economic Development Dept., Planning Division

P.O. Box 2090

East Palo Alto, CA 94303
Q: How to determine planning permit fees?
A: The fees for a permit will vary depending on the type of permit, the division it falls under, and the rate. In order to get an estimate of the fees, you will need to email a planner with a conceptual sketch of your project.
Q: How do I submit for an ADU Zoning Clearance?
A: A submission must contain:

the title of the work

the author’s name

the author’s email address

a mailing address

a bio of the author

a short summary of the work

the work itself

The work itself must be:

a minimum of 1,000 words

a maximum of 10,000 words

a .docx or .doc file

The title of the work
Q: How do I avoid probate at death?
A: There are three ways to avoid probate. 1. Die with zero assets. 2. Die with assets held in a trust. 3. Die with assets titled with legally enforceable / proper beneficiary designations.

WHERE CAN I FIND

Q: Where can I find a planning application form?
A: The universal planning application form can be found in the link below.
Q: Where can I find my zoning designation?
A: The zoning designation of your property can be determined using the zoning map.
Q: Where can I find objective development standards?
A: Article 2 of the City's development standards deals with specific plans. Specific plans are documents that outline the development standards for a particular area. These standards can include things like the maximum height of buildings, the minimum width of streets, and the types of uses that are allowed in an area.
Q: Where can I find information on the City's Housing Ordinance?
A: The City's Housing Ordinance requires that all residential rental units be registered with the City. All landlords must obtain a business license, and all rental units must be inspected every two years. The Ordinance also establishes minimum standards for habitability, including requirements for heating, ventilation, sanitation, and safety.
Q: How can I speak with a planner?
A: If you need to speak to a planner, please schedule an appointment. Appointments can be virtual or in person.
Q: How do I develop in parcels with High Risk Flood Zone designation where structures are not raised 18" above Base Flood Elevation?
A: If you need to be approved for any development in a High-Risk Flood Zone, the substantial improvement (SI) allowed is capped at 50% of the dwelling cost of the structure and proposed improvements.
Q: How do I find out the zoning of my property?
A: The best way to get information on zoning and planning for a specific piece of property in Solano County is to call the Planning Services Division at 707-784-6765 and provide the Assessor Parcel Number (APN) for the property in question.
Q: What should I bring to my first appointment?
A: No need to bring anything, but old estate planning documents, deeds to real estate, or business planning documents (like Operating Agreements or Bylaws) might be helpful.
Q: Who will get my kids if my spouse and I die?
A: It depends on the situation, but generally speaking, a judge will have to appoint a Guardian for your children if you haven't expressed your wishes in a legally enforceable Will.

CAN PERMITS AND INVESTIGATIONS BE RESOLVED EFFICIENTLY?.

Q: How many days does it take to process a permit payment?
A: It may take up to 7 days to receive a response to a permit payment. If you have not received a response after this time, you can email the address listed on the permit with your inquiry.
Q: What needs to occur to resolve a government investigation/inquiry?
A: The first step in preparing for a government investigation or inquiry is to assess the full scope of the matter. This includes determining the nature of the investigation or inquiry, the agencies involved, and the potential consequences. The company should also determine the resources that will be needed, including staff, outside counsel, and subject experts. Additionally, the company should consider whether targeted education is needed for Board members or other company officials, and which employees, vendors, and/or agents need to be notified.
Q: How long will the process take?
A: Estate planning projects usually take about one month from start to finish.

WHAT IS THE PROCESS TO

Q: What is a Design Review Committee Meeting?
A: A Design Review Committee Meeting is a meeting where inter-agency staff members review development projects. The developer may or may not be present.
Q: What is the process to apply for a food truck / mobile vendor permit?
A: 1. Check if the vendor is eligible for a renewal.

2. If they are, request a new background check and updated insurance information from the vendor.

3. Once you have received this information, submit it to HDL for review.

4. If everything is in order, HDL will issue a new vendor permit.
Q: What is a trust?
A: A trust is a legal arrangement in which a person (the trustee) holds and manages property or assets for the benefit of another person (the beneficiary).
Q: What is the difference between a trust and will?
A: A Will is a legal document that speaks on your behalf as of the moment you pass away. A trust can be used to avoid probate and to customize asset distribution.
Q: What is the process to get a project funded, designed, permitted and built?
A: Each of the transportation-related projects proposed in Connect the Coastside will require separate funding, design, permitting, environmental review, and construction. Implementing transportation projects can be challenging, due to the variety of funding sources, environmental concerns and the permitting process.

PROMOTE ROADWAY SAFETY AND REDUCE DRIVERS?.

Q: What are the options and requirements for garage conversions?
A: Garages can be converted into living spaces or accessory dwelling units, but they must meet certain code requirements. For more information, please refer to the garage conversion sheet.
Q: What does the plan do?
A: Improve the transportation infrastructure on the Coastside to reduce traffic and provide more options for residents and visitors.

The plan includes a wide range of improvements, which address the present and future mobility needs of Coastside communities. The plan broadly seeks to:

- Improve safety and access for all users
- Reduce traffic congestion and delays
- Improve public transit service
- Increase the use of non-motorized travel
- Enhance the Coastside’s economic vitality
Q: Why is the plan needed?
A: The County of San Mateo is developing a transportation management plan to address the future transportation needs of Coastside communities. As new development occurs, transportation improvements will be planned and constructed to address traffic impacts.
Q: How does Connect the Coastside promote roadway safety?
A:
Q: How does Connect the Coastside help reduce the number of drivers on the road?
A: The Midcoast region of California is mostly low-density, suburban, and residential, which encourages automobile trips. A range of other factors also encourage driving on the Midcoast, including the lack of public transportation options and the lack of pedestrian and bicycle infrastructure.

contact | terms | privacy
© 2018-2024 semanticjuice.com